Bascule Bridge Operating Machinery Installation


Installation of the Operating Machinery on the MDOT Bascule Bridge over the Rouge River in Wayne County, MI. This included all machinery parts from the motor couplings through the racks on the rack support frames as well as aligning the drive motors, brakes and control instrumentation.

Self-Performed Equipment Installation

Date: June 1, 2015 – June 29, 2015

Project Manager: Phillip Garcia

Architect / Engineer: Toebe

Owner: MDOT

Address: The corner of Fort and Miller Road in Detroit, MI