Chrysler Warren Truck General Assembly


Frame Turnover Gantry System installation. This system turns over a full pick-up truck frame at the Chrysler Warren truck facility. CCI coordinated logistics for a turn key project and installed this system during Christmas shutdown. CCI had to overcome short time frame , and hard to reach final location that required above and beyond rigging plan.

Self-Performed
Owner: Chrysler Group LLC
Construction Manager: Jim Szymanski
Address: 21500 Mound Rd, Warren, MI 48091