Detroit Edison Belt Replacement


CV-4 Belt Replacement. CCI coordinated the removal and installation of one of the largest belts in the Midwest region. This belt carries tons of coal daily, and is the main vein of DTE Monroe power plant. CCI was able to logistically reduce downtime causing a reduced outage that could have cost DTE millions of dollars if not completed in the correct order.

Self-Performed Dated: 2010
Superintendent: Steve Pendleton
Owner: DTE Energy
Architect / Engineer: Construction Manager:
CCI Address: 3500 E Front St, Monroe, MI 48161